Quick Start ON
Saleable—
Cost/Unit—
Total Cost—
Step 1: Define Your Production Scale & Selling Unit
Quick Start hides detailed input steps so you can price faster. Hidden steps are still included in totals using your saved values.
Disclaimer: This calculator provides estimates for planning and educational use. Cannabis laws, licensing, testing, security, and tax requirements vary by jurisdiction. Verify obligations and compliance steps with qualified local professionals.
Tip: Run a first estimate, then replace presets with your own agronomic + market reality.
This affects production totals only. Post-harvest loss % still applies afterwards.
%
Typical losses vary widely. Use this as a placeholder unless you have packhouse/drying data.
Overall Production:Total Expected Production: 0 Units
Saleable Production (after losses):Saleable Units: 0 Units
Step 2: Land Preparation Costs
Step 3: Planting Material & Propagation
Transplant Details
Total Planting Material Cost:
Planting Material Cost per Unit:
Step 4: Irrigation System Costs
**Water Cost:** If using **Borehole/Pump**, enter the system's daily run time and the calculated **Operating Cost per Hour** (fuel/power + maintenance).
If you pump from a river or dam using an electric, diesel, or solar pump, choose the Electric or Diesel Pump option so pump costs are included. The River/Dam option is only for gravity-fed or free-flow systems with no pump energy cost.
Irrigation Systems
Total Irrigation Cost:
Irrigation Cost per Selling Unit:
Step 5: Fertilizer & Nutrient Costs
Enter each fertilizer/nutrient product separately. Application Rate is assumed to be *per area unit* (e.g., kg/Hectare).
Total Fertilizer Cost:
Fertilizer Cost per Selling Unit:
Step 6: Pest and Disease Management
Step 7: Support System Costs
Step 8: Harvest Labor Costs
**Hand Harvest:** Common for flower-focused production where careful handling matters. Labor often spans multiple days as fields are cut, moved, and hung/racked for drying.
A. Pickers & Labor
Optional: Harvest schedule helper (Cannabis)
Open-field cannabis is often harvested in one main window — but labor can still stretch across days/weeks (blocks, staggered fields, wet weather delays). Use this helper to estimate Number of Harvest Days. You can still type your own total harvest days if you already track it.
—
B. Field Sorting & Grading Labor
Labor for basic field sorting/segregation (e.g., remove obvious contamination, separate flower vs biomass/trim pathways, keep lots organized).
C. Trimming & Bucking (Optional)
Enable this for flower workflows where trimming is a major labor or contractor cost. Leave it off for biomass-only scenarios.
D. Post-Harvest Loss Override
Total Harvest Cost:
Harvest Cost per Saleable Unit:
Step 9: Post-Harvest Supplies & Packaging
A. Simple Per-Unit Packaging Cost
B. Additional Packing Materials
Total Packaging Cost:
Packaging Cost per Saleable Unit:
C. Testing & Quality Assurance (Optional)
D. Drying & Curing (Optional)
Drying/curing can be in-house (space, racks, HVAC, utilities, labor) or outsourced. Add each cost line with an appropriate basis.
Total Post-Harvest Cost (Packaging + QA + Dry/Cure):
Post-Harvest Cost per Saleable Unit:
Step 10: Overhead & Farm-Level Fixed Costs
A. Land Costs
B. Licensing & Compliance
C. Security & Surveillance
Use this for fencing, cameras, guards, alarm/monitoring subscriptions, secure storage costs, compliance security checks, and chain-of-custody related admin time.
D. Insurance
E. Certification, Audits & Lab Tests
F. Other Administrative / Overhead Costs
G. Financing / Interest Costs
H. Contingency / Risk Reserve (optional)
A simple buffer for weather, theft, rework, compliance surprises, or yield volatility. Applied to your subtotal before transport.
Risk Reserve Cost:
Risk Reserve per Saleable Unit:
Total Overhead Cost:
Overhead Cost per Saleable Unit:
Step 11: Transport & Delivery Costs
Step 12: Final Summary & Export
Currency / Selling Unit:
Total Saleable Units:
Total Cost for Crop:
Baseline Cost per Unit:
Cost Breakdown
Percentages represent the share of each component in the total cost.
| Component | Total Cost | % of Total | Cost per Unit | Visual |
|---|
Cost Breakdown – Pie Chart
Visual share of each cost component in the total cost.
Markup & Selling Price
Baseline Cost per Unit:
Selling Price per Unit:
Profit per Unit:
Profit Margin %:
Total Profit (Entire Crop):
Cannabis Market Scenarios
Optional “what-if” views based on a base selling price you choose below. They do not change your baseline cost calculation.
This choice affects only the optional market layers below — not your baseline totals.
Save & Export Results
Optional. If enabled, your last inputs are saved in this browser. Turn it off to start fresh.
Export (JSON): Saves your calculator entries as a small “settings snapshot” you can reload later.
Import (JSON): Loads a settings file you previously exported from this calculator.
Note: JSON is not Excel. Use Download CSV for Excel/Sheets.
Help
Important: This calculator is intended for agricultural planning and financial assessment. Cannabis cultivation must comply with applicable laws, licensing requirements, and regulatory approvals in the relevant jurisdiction.

